First Panel Complete

Or, almost.  There are still a few touch-ups and some grouting to do, but doesn’t this look like a trip down a west Austin caliche hillside?

First panel of University Presbyterian Church's mosaic project, "The Feeding of the 5000"

Frames for each of the six panels are to be welded in January, but in the meantime, completed panels will be stored, then trotted out for special occasions.

Be sure to leave a comment on this blog if you want to be added to the VolunteerSpot e-mail  mosaic work calendar.  About 40-50 people have been involved so far.

Advertisements